Stickney WTP Reservoir Improvements

Engineered by HDR Engineering, Inc. for Board of Water and Sewer Commissioners

Approximate Construction Cost $13.1 Million | Mobile, Alabama

Projected Timeframe: Spring 2025


This project primarily consists of the following: improvements to the existing interior embankment of the reservoir, partial removal and installation of existing reservoir drainage piping and overflow spillway, removal, and replacement of existing raw water piping system.