Sylvania WPCP Upgrades

Engineered by Integrated Science and Engineering for City of Sylvania

Approximate Construction Cost $12.5 Million | Sylvania, Georgia

Projected Timeframe: Fall 2026


This project primarily consists of the following: WPCP upgrades including a new staged reactor basin, sludge collection box, filter system, Parshall flume, chlorine contact chamber, cascade aeration structure, RAS pump station, aerobic digester and dewatering system. Additional modifications include enhancements to the existing aeration basins and aerobic digester, modifications to existing clarifier piping and replacement of several gates.