Adams Field WRF #4 Blower & Controls
Engineered by Garver, LLC for Little Rock Water Reclamation Authority
Approximate Construction Cost $1.1 Million | Little Rock, Arkansas
Projected Timeframe: Winter 2025
This project primarily consists of the following: mechanical and electrical installation of one 350HP multi-stage Centrifugal Blower with control panel and VFD at the Adams Field Water Reclamation Facility.