Wastewater Treatment Facility Improvements CMAR

Engineered by PMI, a Terracon Company for Stuttgart Municipal Waterworks

Approximate Construction Cost $13.6 Million | Stuttgart, Arkansas

Projected Timeframe: Spring 2026


This project primarily consists of the following: Upgrades are centered around a new oxidation ditch along with replacement of clarifier equipment, new tertiary disc filters, chemical feed equipment, rehab of existing belt press, controls, and ancillary item such as yard piping. Removal and disposal of existing equipment and structures will be within the project scope. The design flow of the facility is 2.0 MGD.