RWI Screen Replacement

Engineered by Barge Design Solutions, Inc. for City of Kingsport

Approximate Construction Cost $1.4 Million | Kingsport, TN

Projected Timeframe: Fall 2024


This project primarily consists of the following: Replacement of (3) Traveling Screens, the replacement of the existing trough, and the replacement of the spray wash water piping from Screen No. 3, together with associated electrical work shown on the contract drawings and required for a complete functioning system.