This project primarily consists of the following: replacing two (2) Vertical Turbine Pumps at an existing Raw Water Intake Pump Station along with associated valves. Installing a new 16” Raw Water Intake line with two (2) new Intake Drum Screens and New Air Burst Systems. The existing intake pipe will be abandoned in place at completion.