Raw Water Intake, Pump Station, & Plant Modifications

Engineered by Utility Engineering Consultants, LLC for City of Lafayette

Approximate Construction Cost $1.3 Million | Lafayette, Alabama

Projected Timeframe: Winter 2023


This project primarily consists of the following: replacing two (2) Vertical Turbine Pumps at an existing Raw Water Intake Pump Station along with associated valves. Installing a new 16” Raw Water Intake line with two (2) new Intake Drum Screens and New Air Burst Systems. The existing intake pipe will be abandoned in place at completion.