This project primarily consists of the following: removal of existing 600,000 GAL Steel Clearwell; construction of an 810,000 GAL Fusion Powder Coated Bolted Steel Tank; construction of Geodesic Aluminum Dome and Cover Roof; construction of baffle walls; preparation and stabilization of existing Ring-Wall Footing and Oil-Sand Pad; disconnect and reinstall electrical; install Chlorine Analyzer Sample Line and Disinfect New Clearwell; various valves accessories and everything necessary for a complete installation.