This project primarily consists of the following: Replacement of existing twelve (12) Passive Intake Screens and associated Isolation Valves and Floor stand Actuators; structural modifications including replacement of exiting grating covers and guard railing; miscellaneous electrical modifications and integration of this equipment into the existing facility control system.