Wolf Creek Water Pollution Control Plant Upgrades

Engineered by Carter & Sloope, Inc. for City of Gray

Approximate Construction Cost $10.5 Million | Gray, GA

Projected Timeframe: Winter 2023


The project primarily consists of the following: a new headworks structure with a mechanical and manual bar screen, a new splitter box, a new field-erected treatment plant, rehabilitation of the existing field-erected treatment plant, new multi-stage centrifugal blowers, new positive displacement blowers, a new effluent structure with tertiary disc filters, ultraviolet disinfection, a Montana Flume, a post-aeration blower, a plant pump station, rehabilitation of sludge feed pumps, chemical feed equipment, a new control building, conversion of existing control building to electrical building and SCADA.