Holly Tree Gap Pump Station

Engineered by Inflo Design Group, LLC for Milcrofton Utility District

Approximate Construction Cost $1.1 Million | Brentwood, TN

Projected Timeframe: Summer 2022


This project primarily consists of the following: site demolition, grading, paving, retaining wall and fence construction. Installation of 1,000 KW generator and automatic transfer switch. Installation of 600-HP horizontal split case pump and associated piping. Installation of three (3) variable frequency drives and associated electrical equipment. Installation of a secondary meter vault and valves including connections to existing mains. Installation of tees and valves on the existing transmission main at the site downstream of the pump station. Miscellaneous site improvements and building upgrades. All major equipment and materials are owner furnished.