Big Branch South Pump Station Expansion

Engineered by Highfill Infrastructure Engineering, P.C. for City of Raleigh

Approximate Construction Cost $1.6 Million | Raleigh, NC

Projected Timeframe: COMPLETE


Work on this project includes pump station improvements, including demolition, temporary bypass pumping system, one pump with suction and discharge piping, generator, electrical gear, electrical building, permanent bypass pumping connection, two hydraulic channel grinders, ventilation modifications, and site work.