Decatur Utilities NW Area Industrial Booster Pump Station

Engineered by Garver for Decatur Utilities

Approximate Construction Cost $3.6 Million | Decatur, AL

Projected Timeframe: COMPLETE


This project includes, but is not limited to: booster pump station site clearing, grading, and paving; connections to an existing 36-inch water main; site piping, valving, and flow meter; new booster pump station building including all piping, electrical room, pump room, instrumentation, traveling bridge crane, and pipe trenching, control and SCADA integration to add new booster pump station to existing SCADA system; and site paving and landscaping.