Macon Lower Poplar WRF Equipment Installation

Engineered by Macon Water Authority Engineering for Macon Water Authority Engineering

Approximate Construction Cost $1.6 Million | Macon, GA

Projected Timeframe: Spring 2022


Demolition of two (2) existing clarifiers mechanisms and installation of two (2) new Envirodyne clarifiers that are owner furnished/contractor installed.