This project primarily consists of the following: The project includes installation of 3 submersible pumps into the existing dry pit, raising electrical equipment and controls above flood elevation (Service Entrance Transformer, Automatic Transfer Switch, 120/208 3-phase Transformer, 120/208 3-phase Panelboard, Seal Water Pump Tank, (3) Furnas Soft Start Panels, Air Compressor Control Panel, Bar Screen Control Panel, Wall Louver Motor Operator, (3) Wet Well Pump NF Disconnects), and installing grating and handrails for operators to reach the elevated electrical equipment.