Lake Franklin Dam Rehabilitation

Engineered by Hazen and Sawyer for Georgia Department of Natural Resources

$1,292,000.00 | Pine Mountain, GA


The principle features of work to be performed for this project are; clear and remove all trees and heavy vegetation from the existing dam crest, slopes, earthen auxiliary spillway. Lower and maintain the lake elevation during work. Asses and rehabilitate the low-level drain inlet and control hoist as needed. Lower and widen the earthen auxiliary spillway. Construct a concrete cut-off wall across the auxiliary spillway, Construct a concrete wave wall along the crest of the dam. Construct a stability berm on the downstream slope. Extend the reinforced concrete principal spillway outlet. Construct a riprap plunge tool. Install a collar and seepage drain system.


We're Hiring

We encourage qualified, aggressive individuals to join our team and become part of an organization who considers employees their greatest resource.

APPLY ONLINE

Employees are our greatest resource, and Haren Construction is fully committed to their safety. With our safety program and full-time safety manager, we work hard to provide every employee with safe working conditions. Working in the water and waste treatment field, we partner closely with our clients to ensure the safety of every jobsite and the public at large.