Peytonsville Trinity Road Booster Pump Station

Engineered by Inflo Design Group, LLC for Milcrofton Utility District

Approximate Construction Cost $232k | Franklin, TN

Projected Timeframe: Spring 2023


This project primarily consists of the following: the installation of a Booster Pump Station, bypass check valve vault, connections to existing 6-inch and 8-inch water lines, and electrical service and controls.