Engineered by Inflo Design Group, LLC for Milcrofton Utility District
Approximate Construction Cost $232k | Franklin, TN
Projected Timeframe: Spring 2023
This project primarily consists of the following: the installation of a Booster Pump Station, bypass check valve vault, connections to existing 6-inch and 8-inch water lines, and electrical service and controls.